Common Area Rewires for Owners Corporations in Melbourne

Rewiring common areas — stairwells, corridors, car parks and plant rooms — bringing the building up to current Australian standards.

Common Area Rewiring

Common areas in older buildings often have wiring that no longer meets current standards. A common area rewire addresses:

  • Stairwell and corridor wiring – outdated cables, missing earthing and inadequate circuit capacity
  • Car park wiring – exposed cables, damaged conduits and insufficient power for lighting and outlets
  • Plant room wiring – wiring to lifts, pumps, HVAC and other building services that may be decades old
  • Roof and external wiring – exposed wiring that has degraded from weather and UV exposure

When It Is Needed

Common area rewires are typically needed when:

  • Defect notices – ESV or the distributor has issued a defect notice for the common area wiring
  • Building survey – a building inspection has identified wiring that no longer meets AS/NZS 3000
  • Frequent faults – common area lights, power points or equipment are tripping or failing regularly
  • Planned upgrades – adding new lighting, security systems or EV charging that the existing wiring cannot support

Legacy Building Upgrades

Older buildings present unique challenges:

  • Lead-sheathed cables – older buildings may have lead-sheathed or cloth-insulated cables that must be replaced
  • Conduit access – existing conduits may be blocked or too small for modern cables, requiring new trunking
  • Asbestos – older buildings may have asbestos-containing materials near wiring routes, requiring licensed removal before electrical work
  • Structural constraints – concrete and masonry walls require core drilling and surface-mounted trunking

We have experience working in heritage and legacy buildings — we plan around the constraints and deliver a compliant installation.

What to Expect

1

Assessment

We inspect the existing common area wiring, identify the extent of the rewire and agree on the scope with the strata manager.

2

Quote & Staging

Fixed-price quote with a staged work plan. Larger rewires are broken into phases to minimise disruption to residents.

3

Installation

We remove old wiring, run new cables, install new circuits and test everything. Work is scheduled to minimise noise and power outages.

4

Testing & Certification

Every circuit is tested, labelled and certified. We issue the compliance paperwork and update the building electrical records.

Frequently Asked Questions

Will residents lose power during the rewire?
We plan the work to minimise disruption. Common areas may lose power in stages — for example, one floor at a time. We provide advance notice and complete each section as quickly as possible.
How long does a common area rewire take?
A small building (20–30 units) typically takes 3–5 days. Larger buildings may take 1–2 weeks. We provide a detailed timeline in the quote.
Can the rewire be done while residents are living in the building?
Yes — we work around the residents. Noisy work (core drilling, chipping) is scheduled during business hours. We keep common areas safe and accessible throughout the project.

Premium Service,
Quality Results,
Since 1963.

Over 63 years of trusted service across Melbourne

Ready when you are

Click to add photos or drag & drop

JPEG, PNG, WebP, GIF, HEIC up to 20MB each

Prefer to call?

03 9853 2644

7:30am – 4pm
Business Days

Gold Master Electrician
Energy Safe Victoria
Working With Children Check
Get in touch Call us